If you can swing it, it's best to pick up as much as possible at one time. Not only so you have everything you need in hand in case you want to reference something and how it looks, works, and goes together, but also for less repetitive work for the Doyel gang (having to pick and ship items). I thought I would do it in stages, but ended up doing Stage 1 and 2 at the same time and I was very glad that I did. Besides, Stage 1 actually goes very quick and you are ready for Stage 2 before you know it.Just registered my donor vehicle to get the license and it has to sit in my garage for 4 weeks since I have to wait for the title to come in the mail. Because the car was out of state, I couldn't get a quick license.... On a more positive note, I got word from Adam that my frame will be placed on the jig either the second or third week in June. Right now I'm on the stage plan, but I may just out right pay for all and have it come all at once.
Did you use rock auto.com?I just ordered a starter, e brake, engine timing cover gasket, and an engine valve cover gasket.
Lol; I did mine on my dining room table for same reasons. Wife wasn’t terribly thrilled.Since my garage is full, i decided to do the main harness on the dining room floor.