A bit more progress....Garage Door insulated, LED Shop lights installed and video 16 complete.
I have to say it was a lot tougher then I thought it was going to be to pull the hoses. My friend and I struggled with just finding an bolt / socket small but large enough for the zip ties to keep hold. The end result was an 5/8 socket and a couple zip ties. I used two hose clamps that were pretty close together to get the zip ties tighter. After that finally tool hold we used two pipes to keep a grip on the rope.
A pneumatic rivet gun would have also helped.
View attachment 7042View attachment 7043
Hoping to knock out the next video sometime this week. I'll be installing an heater in the garage this weekend
.