Yeah that is some great exposure. Awesome video too, especially once they show the drag. 10.8 quarter mile ain't no joke.Have a feeling you guys are gonna get some new orders.
And that 10.8 was with a bad start. Still pulled hard, and put down a great time.Yeah that is some great exposure. Awesome video too, especially once they show the drag. 10.8 quarter mile ain't no joke.
I don't think so but they are close. Jim is building an auto turbo and his chassis is 156 and that was back in September.Have they hit chassis 200 yet?
Only problem there is it's missing 4 cylinders haha.I would love for Cleetus McFarland to get ahold of one.
I'd rather see Rob Dahm rotary swap a Goblin. Would be a great match, super high revs and super light weight.I would love for Cleetus McFarland to get ahold of one.
As long at they don't ship him the kit via UPS...I'd rather see Rob Dahm rotary swap a Goblin. Would be a great match, super high revs and super light weight.
I put down the deposit on my kit in early September, and I should be receiving it in about a week. So it's currently looking like about 8 weeks' lead time, but there's nothing special about my kit (standard length, city/open, normal entry frame).Anyone know the approximate lead time from a recently purchased kit? I was planning to order about 2 months before receipt of my work bonus in February but I might need to push that up now with this exposure!
Happy for the DF guys, though.
Honestly could go for a 4 month wait, then I could get in line with the deposit now! ha. Thanks guys.¯\_(ツ)_/¯
If you are planning to powder coat it may be 4 months. My deposit was 8/1 and picking up 11/9.Honestly could go for a 4 month wait, then I could get in line with the deposit now! ha. Thanks guys.
That's the best part. I'd love them to turn it into a track/drift carOnly problem there is it's missing 4 cylinders haha.