Wow time for a mega update. Project was put on hold while I changed jobs at end of 2016 and purchased my first home this past May. Lots of time was spent organizing the garage to make the build process easier. This past weekend my wife was out of town and I worked like a madman for over 40 hours and accomplished a lot.
March 2017
Received stage 2 parts and determined what needed to be painted/powder coated, ended up just going with some primer and spray can bedliner.
While disassembling the brake position sensor from the pedal box for painting, the head sheared off. I tried cutting a notch for a screwdriver or pliers, but no luck. Will likely just order one from eBay.
April 2017
Painted parts hanging to dry
April 2017
Riveted the floorpan and front firewall into the car, did not get pictures of this but was straightforward. Wife helped out with getting the radiator hoses in through the lower frame tubes. WOW what an challenge. Used the tire shine lube method and it was still a huge pain in the rear.
May 2017
Moved into new house! Goblin quickly claimed its section of the garage. The move forced me to do a quick inventory of all of the donor and kit parts and I placed it all in boxes.
August 2017
Did an extensive organization of the garage, getting ready to get into the project again
October 6 2017, Friday 7pm
Getting ready for maniac build weekend, picked up any missing tools and started at it, starting with installing the steering rack and power steering unit
Disassembling steering components
Put in the brake booster, pedal box, steering shaft
October 7 12:07am, time for the radiator
October 7 1:30am, Radiator in place, time to place the radiator hoses in place
October 7 2:20am, installed fuel pump and tightened down the ring for the tank and finished connecting the hoses