Quick Update:
I updated the Google Docs Excel and it is now 100% accurate through today. I am picking the hood up from being wrapped tomorrow (Pattern attached below) from Signorama NRV in Christiansburg, VA. For the exhaust, Tick Performance in Mt Airy, NC moved all of their in-house fab work to Rock Solid Motorsports in Statesville, NC. They have a long lead time because they do great work but I am scheduled for the October time frame.
I have driven the car around 20 miles locally so far and the tune is working in quite well. I decided I wanted to start with the factory file and do 100% of the tuning myself. So far it has been great. Small steps are key. Drivability at mile 1 was generally very poor. Now it is very smooth and quite fun at a mere 7psi. Once the car is road legal, I will begin bumping it up.
On the topic of being road legal, the registration material was delivered to the Virginia DMV in Richmond mid-February with an expected 3 week turn around. I called on March 25th to inquire about the status. They confirmed receipt of the packet and everything needed to process it was enclosed. However, they stated the process is taking 4-6 weeks now due to the pandemic. So, here I am on April 30th and haven't heard anything or seen the tax check cashed... A checkup call is planned this afternoon.
EDIT: I just got off the phone with the Virginia DMV. They are currently processing kit car, salvage title, and specialty title vehicle paper work received on March 5th, 2020 but weren't quite sure why mine hadn't been completed yet. So, I am now awaiting their return phone call.