Desert Sasqwatch
Goblin Guru
Not sure the wife would be too keen on that, but she understands why they are in my Goblin.
Lol I don't care who you are that's funny stuff there.I'm expecting the house to be full of speed holes.
Tim. Lots of us are excited to see you get back to building!Update:
Finally getting around to setting up my new garage (the in-house honey-do list is getting shorter) - trying to maximize what little garage space I do have. Lots of overhead storage racks going in; these were a tight squeeze to get two 2X8 racks into the 10X9 space at the back of my garage.
View attachment 29948
Have one more overhead rack to install and hopefully keep as much stuff off the floor as possible. Because the floor space fills up quick with the necessities.
View attachment 29949
Just have get to my leg to heal up now - tore a calf muscle really bad this weekend - to get this finished up and maybe, just maybe, get a wrench turned on my Goblin soon.
There's a stretch of about a mile where you'll be comfortable... As Sasqwatch said, the temps at the bottom are VERY different than the temps at the top...For some reason, I no longer get notifications from the DF site, just dumb luck that I saw this here. That sounds like a fun drive. When would be the best season? I like temps someplace between 80-83F.
When I drove that pass years ago, we started with the AC on, drove with windows open and ended with the heat on...Last year we drove it in heat that was debilitating. 115 was so hot that I drove it 1 hour and was done the rest of the day. I have a new found respect for these people who pass through Vegas on their touring bikes in the middle of the heat. Truthfully, I don't see how they do it. It has to be fun for some self destructive issue only they can know. For me, 100 degrees was the max temp to drive in and find it enjoyable, and that was questionable. Sooooo, I guess I'm driving that route in early may, leaving before sun up and taking a jacket with me.
Had the house keys for less than 1 day before I started on the epoxy floor, took a solid 4 days to complete the etching and 3 coats. Lots of work but well worth it.I’m envying the epoxy floor.