averageJOEschmo
Active Member
Progress has been slow as of late but did complete a few big tasks.
Got the subframe installed. It was not easy to get all the holes to line up between the goblin frame and subframe and solid transmission mounts. Used some ratcheting tie-downs and a hydraulic ram to move things around enough to get everything to align.
Shout out to @Goblinfanclub1234 for helping me track down the tap I needed to clear the treads in the frame that got powder coated. http://dfkitcar.com/forum/index.php?threads/subframe-bolts.4235/
I also have been working on the gauge cluster. I'm not a fan of how the stock cluster looks with the sweeping cover once it's in the goblin, so I set out to make a modified version.
Got it intalled and wired up.
Next big step is the first start up....
Got the subframe installed. It was not easy to get all the holes to line up between the goblin frame and subframe and solid transmission mounts. Used some ratcheting tie-downs and a hydraulic ram to move things around enough to get everything to align.
Shout out to @Goblinfanclub1234 for helping me track down the tap I needed to clear the treads in the frame that got powder coated. http://dfkitcar.com/forum/index.php?threads/subframe-bolts.4235/
I also have been working on the gauge cluster. I'm not a fan of how the stock cluster looks with the sweeping cover once it's in the goblin, so I set out to make a modified version.
Got it intalled and wired up.
Next big step is the first start up....