I built my Goblin in from Nov. 2018 - June 2019.
Before I learned what a DF Goblin was, I built my shop.
2016 02 09 Foundation Excavation
2016 10 01
First Sheet Metal
2016 11 29
Trim And Walls
2017 05 21
The Compass Rose
Today I glued new sacrificial MDF board to my DIY CNC router. The weights are to hold it down until the glue dries.
The CNC table has 9 vacuum zones, 9 vacuum valves, and only 6 sacrificial boards... so far.
The white gantry moves in the Y direction
The red-ish plate moves in X direction
The blue plate moves in the Z direction.
That window AC unit makes the shop wonderful in the summer heat.
The goblin is back in the shop, as I think the intercooler water pump needs repair or replacement.
This weekend we pulled the Dodge 360 ci V8 out of a donor vehicle... my neighbor's project that we are weekend warriors on.
h
My shop is half wood working, half metal working, half automotive. 3 halves don't fit in a whole shop, hence the mess. At least it is getting used!