My new project

escapepilot

Goblin Guru
Finally got started with the project part. Old dash wiring is out. I'm glad I opted to rewire the car as I found several twist with tape splices, wires not connected to anything at either end, and even a few bare spots.

So the plan for May is:

1. finish removing firewall insulation and heater ducting
2. POR 15 for floors and firewall.
3. install Hushmat on firewall and front floorboards.
4. install RainGear wiper system.
5. install new (to me) RetroSound stereo.

The engine is still at the shop, but I have enough to keep busy till probably end of June.
 
Top