Search results

  1. winddude

    How long to strip donor?

    Did most of you strip the donor before or after your chassis arrived? And how long did you take to strip and prep the donor parts? Man hours and total time span. I'm at least 3 months out for my frame, and it's much easier to move a running donor than a pile of parts.
  2. winddude

    WindDude's Standard Street Goblin - 07 SS donor - Canadian Build

    Well I picked up the donor today, so I guess I can start the build log. A little Background Been a gear heads since I was little, worked on many project cars over the years and always dreamed of building my own car from scratch. Initially I was planning to build a locost, but locally miata...
  3. winddude

    Frame height?

    Is the 42" and 44" for the height the chassis or the rolling height?
  4. winddude

    Would you have done anything differently?

    Looking to pull the trigger on an order soon, assuming I get the donor I want this week. Would you have done anything differently for your build? Modified the frame at all? Ordered different options or not ordered certain options? Cheers.
Top