Ghostknife
Goblin Guru
- Ghostknife Goblin Guru
Welp the labels came in today which is cool. The drivetrain is ready to drop but I'm going to hold off until next week when we get a warm up. My plan is to pull the engine and trans out of the car and then use my truck to pull the donor car out of the garage into a party tent. I will be able to work on pulling the rest of the bits from inside while having room to work on the engine in the garage. I found it weird that a Option B kit was installed but no the dual pass. My dual pass should be arriving today from ZZP. This is how its currently routed. .