Towerdog
Goblin Guru
Current lead time is 11-12 weeks.Things picked up quite a bit. Lead time was quite a bit shorter a while back. Back when we ordered ours in 2018, it was over six months. That seemed like for eeeeevvvvveeeeeerrrrrrrrr.
Current lead time is 11-12 weeks.Things picked up quite a bit. Lead time was quite a bit shorter a while back. Back when we ordered ours in 2018, it was over six months. That seemed like for eeeeevvvvveeeeeerrrrrrrrr.
2.0 Turbo, welcome to the forum. Start a Build Log so you can keep all of your information in your post and not hijack someone else's build log.
Give us some details and always post photos if you have them.
Lawrenceburg - 47025What part of Indiana?
Wow 26k already? What are your big expenditures?Easy to do, running up the bill on your build. All those shiny new parts and they would look sooo good on your Goblin! I've got north of $26K wrapped up in my car so far and all I have to show for it is a bare frame and lots and lots and LOTS of boxes.
lol, drillbitsWow 26k already? What are your big expenditures?
Don't want to hijack Towerdog's thread, but there is very little of the donor left - wiring harness, subframe - everything else has been replaced with new or rebuilt. Adds up $$$ quick. My build log has many of these detailed.Wow 26k already? What are your big expenditures?
No worries...Don't want to hijack Towerdog's thread, but there is very little of the donor left - wiring harness, subframe - everything else has been replaced with new or rebuilt. Adds up $$$ quick. My build log has many of these detailed.
Sorry Towerdog.