Assembly Day - 9
Got the rear brakes installed, still need to run the brake lines and the ebrake cables. Had to add an extra washer between the knuckle and the adapter to have the correct spacing around the rotor. Installed the spacers to make sure everything fit. Looked like I will have to pull the spacers back off and trim about 1/16th - 1/8th off the stud. There is plenty of space before the threads start so should be good.
Got the exchanger fan working. I installed the diode in the wrong direction. Now fan turn on with key on.
Smoke machine on order. Should get here Friday. Want to confirm what I found while inspecting today. It looks like I have a problem with the way the gasket is lined up below the supercharger. In the picture you can see part of the rubber gasket that should be making a seal. I believe I have found a major intake leak. I pulled and inspected the fresh set of plugs I installed yesterday. the threads looked good on all of them this time so I do think that one was a little loose.
Goal for the weekend, smoke the intake. Pull supercharger and replace gasket. Install 42# injectors and GM stage 2 tune. Start engine again and hope that she is happier.